Kolkata Metro Line 3

Kolkata Metro Line 3 is a line of the Kolkata Metro, which is still under construction from 2019. The route is about 14.215 kilometres (8.833 mi) long from Joka to Esplanade with an extension of 2 km to Diamond Park from Joka. It will connect with Kolkata Metro Line 1 at Park Street and run in parallel up to Esplanade where it will also connect Kolkata Metro Line 2 . kolkata metro Line 3 is being operator by Rail Vikas Nigam Limited.

It is partially underground and partially elevated. Around 6.32 kilometres (3.93 mi) of the project will be underground and the rest 8.5 kilometres (5.3 mi) of the metro line will be elevate. The project is getting delayed because of  non availability of land for the construction of Joka train depot. RVNL was given the land required In 2019, for building the depot and the construction for its boundary wall and land development which started in February 2019. In April 2020 tenders for its construction and plant & machinery (M&P) were invited.

For Majerhat Bridge collapse, the construction was further delayed in September 2018 because the metro was being built right next to the bridge.

Tender for phase 1 (Majherhat to Esplanade) underground section has been published in 1st week of December,2019.

In 2010-11 the work has been sanctioned for new Metro line from Joka to B.B.D. Bagh about a length of 16.72 kilometers at cost of Rs. 2619.02 Cr. But, later the route was shortened and planned to terminate at Esplanade station. A other separte Depot is under construction in Joka. It is being built by RVNL,  and Simplex Infrastructures got the tender. The extension of this line to IIM and Diamond Park about 2 km has been sanctioned in the cost of Rs. 294.49 Cr. in Budget of 2012-13 .The execution of this work has been operated by  RVNL.

KOLKATA METRO LINE 3 STATION LIST

There are 3 phases in this line-

PHASE 1 – Joka to Majerhat (Under construction)
PHASE 2 – Majerhat to Esplanade (After completion of phase 1)
PHASE 3 – Joka to Diamond park (After completion of phase 2)

 

SL NO STATION NAME LAY OUT PHASE
1.
DIAMOND PARK
ELEVATED
PHASE 3
2.
IIM
ELEVATED
PHASE 3
3.
JOKA
ELEVATED
PHASE 1
4.
THAKURPUKUR
ELEVATED
PHASE 1
5.
SAKHERBAZAR
ELEVATED
PHASE 1
6.
BEHALA CHOWRASTA
ELEVATED
PHASE 1
7.
BEHALA BAZAR
ELEVATED
PHASE 1
8.
TARATALA
ELEVATED
PHASE 1
9.
MAJERHAT
ELEVATED
PHASE 1
10.
MOMINPUR
UNDERGROUND
PHASE 2
11.
KIDDERPORE
UNDERGROUND
PHASE 2
12.
VICTORIA
UNDERGROUND
PHASE 2
13.
PARK STREET
UNDERGROUND
PHASE 2
14.
ESPLANADE
UNDERGROUND
PHASE 2

KOLKATA METRO LINE 3 MAP

 

KOLKATA METRO LINE 3 MAP

 

 

you may know about   kollkata metro line 1 and kolkata metro line 2 which is currently operational.

To know about kolkata metro time table , fare details and route and map plese visit kolkata metro

 

Share

You may also like...

Leave a Reply

Your email address will not be published. Required fields are marked *